Visualize task risk and reach confidence targets with interactive probabilistic estimation.
应用详情更新日期:2026年8月11日
适用于:
2万+
概览
ProjectCare Insight helps project managers reason clearly about 
schedule uncertainty — without a statistics background.

Enter Optimistic, Most Likely, and Pessimistic durations for any 
task and instantly see a probability distribution, confidence 
interval, and an interactive seven-axis risk radar — all in one 
panel inside Google Sheets.

Key capabilities:
• Visual risk radar — seven dimensions of task uncertainty 
  rendered as a heptagon you can explore and reshape
• Drag to explore — move radar vertices to test assumptions 
  and watch probability outcomes update in real time
• Optimize for a target — set a desired confidence level and 
  let the engine find the estimate blend that achieves it
• Smart Analyst — plain-language narrative explains what the 
  numbers mean and flags risk signals automatically
• Load from your sheet — connect to task data already in your 
  spreadsheet; no manual re-entry

Powered by a Monte Carlo simulation engine with shape-adaptive 
probability optimization, Insight brings professional-grade 
estimation reasoning to every project manager.
其他信息
定价免费
开发者
ProjectCare Insight”将请求获得以下权限。了解详情
ProjectCare Insight”将需要访问您的 Google 账号
这样可让ProjectCare Insight
在 Google 表格中创建电子表格,以及查看、修改和删除您在 Google 表格中的所有电子表格
在 Google 应用的提示和边栏中显示和运行第三方网页内容
查看您的 Google 账号的主电子邮件地址
查看您的个人信息,包括您已公开的任何个人信息
评价
语言:
排序依据:
Google 不会核实评价或评分。 详细了解评价
没有评论
搜索
清除搜索内容
关闭搜索框
Google 应用
主菜单